Plastering for extensions, new builds and renovations
Board, skim and make good on extensions, loft conversions, garage conversions and full renovations, fitted around your builder and the other trades.

New builds & extensions
What the job involves
Plastering sits right in the middle of most building projects. It comes after the structure, first-fix electrics and plumbing, and before second-fix, kitchens and decorating. Getting the timing right keeps the whole job moving, so we agree dates with you or your builder and turn up ready to work when the rooms are ready for us.
On extensions, the hard part is often where new meets old: the line where the new plaster joins the original house. We plan that joint carefully so the two surfaces finish flush and the crack that so often appears there is less likely to show. Loft conversions bring sloping ceilings, dormers and fire-rated boards, and garage conversions usually need insulated linings.
We work for homeowners managing their own projects, for main contractors and for small developers. On larger renovations we can phase the work room by room so parts of the house stay in use.
On the day
Step by step
- 1
Programme
We agree when the rooms will be ready, from first-fix to plastering.
- 2
Board
Ceilings and walls boarded with the right boards in each space.
- 3
Plaster
Skimmed or plastered, with corners, reveals and junctions formed cleanly.
- 4
Hand back
Rooms left clear and ready for second-fix and decorating.

Before you book
Good to know
First-fix first
Back boxes, cables and pipework should be in place before we board and plaster. It saves cutting into fresh plaster later.
Ventilation
New extensions hold a lot of water from plaster and screed. Good ventilation and gentle heat help everything dry before decorating.
Areas
New builds & extensions across Leeds
We carry out this work throughout the city and in the towns and villages around it, including these areas.
All areasFAQs
Questions about new builds and extensions
Do you work with my builder?
Yes. We regularly fit into a builder's programme and coordinate with electricians, plumbers and joiners on site.
Can you plaster a loft conversion?
Yes, including sloping ceilings, dormers and fire-rated boards. Your builder or building control will confirm which boards are required.
How do you stop cracks where the extension meets the house?
The junction is prepared and reinforced before plastering. Some movement is normal as a new structure settles, but careful preparation reduces the risk of a visible line.
Do you take on work for developers?
Yes, from single plots to small developments. Send us the drawings and programme and we will quote.
Walls or ceilings need sorting?
We come out, look at the plaster with you and send a written quote. Free, and no obligation.